    Acoustic Enclosures

    Dong Energy

    Kimpton developed an industry first in their turnkey acoustic enclosure project for Dong Energy.  Each of the twelve enclosures were designed to be four hour fire resistant with an insertion loss of 35dB at 100Hz one-third octave band.

    Siemens

    Siemens are an existing customer of Kimpton’s and approached us for this contract based on the success of similar previous work. 

    UK Power Reserve

    Due to their success in agreeing new supply contracts with National Gird, UK Power Reserve were committed to increasing their standby electricity generating capacity.

    Stilling Coalfield

    Stilling Fleet Coalfield

    Stillingfleet was part of the Selby coalfield in North Yorkshire, one of the biggest and most sophisticated mining operations in Europe.

    Sheringham Shoal Offshore Wind Farm

    Sheringham Shoal Offshore Wind Farm resides 17km off the North Norfolk coast. It’s 88 turbines each with a blade span of 52m extend for 6km into the North Sea.

    Davyhulme Waste Water Treatment Works

    Davyhulme Waste Water Treatment Works

    As one of the largest waste treatment plants in Europe, Davyhulme WWTW serves a population of 1.2 million people around Manchester.

    Converter Transformer Enclosure

    Converter Transformer Enclosure

    Kimpton Acoustic Engineering was employed by ABB (Sweden) to overcome the design challenges of providing purpose built acoustic enclosures to encapsulate the converter transformers situated at their Connah’s Quay, North Wales and Woodlands, Ireland sites.

    The Shard

    The Shard

    A 306 metre glass spire, The Shard will be home to office space, residential apartments, a five-star hotel, retail units and restaurants spread across 600,000 sq.ft and 72 storeys once completed in 2012 by main contractors Mace Group.

    Kimpton Rochdale National Grid Transformer Image

    Rochdale National Grid Transformer

    Kimpton Energy Solutions were employed by Morgan Sindall to assist them in meeting the noise emissions criteria set out in the planning permission for the replacement transformer.

    Gwynt Y Mor, Offshore Wind Farm Image

    Gwynt Y Mor, Offshore Wind Farm

    Kimpton Energy Solutions were employed by Siemens Transmission and Distribution to assist them in meeting the noise emissions criteria set out in the planning permission.