• 0151 343 1963

  • Blog

    • Neha Sharma has joined the Kimpton Acoustic Engineering team as a Products and Materials Engineer. Her journey to join us has taken her halfway across the world and through some very interesting diversions.

      Neha Sharma Kimpton Acoustic Engineering

      Speaking to Neha about her career to date she said “…

      more >
    • Not to be put off by a lockdown, the Kimpton team pulled together like never before to help those who needed it most when the UK and the NHS in particular, was under serious pressure. Here are just a few of the initiatives the team took to help those who needed it most.

      1. Visors for the NHS

      Our own Managing…

      more >
    • The Incredible Edible movement started back in 2008 with the aim of creating kinder, more confident, more connected communities, all united around the power of growing food together. There are now over 100 members within the network in the UK and over 1,000 worldwide. It has made such an impact, that one of the two…

      more >
    • We’ve written a lot recently about reopening offices and the process you need to go through to properly recommission the air conditioning system in your office or workplace.

      But that still leaves the question unanswered ‘is it safe (or advisable) to use my air conditioning in my office or workplace?’

      Is it safe, am I putting my colleagues at risk…

      more >
    • In our previous post, we shared the detailed checklist for an entire HVAC system when you are preparing to reopen your office or business after a long shutdown.

      One of the key elements to the checklist was to change filters throughout the system to ensure they were safe, clean and not harbouring bacteria that will have…

      more >
    • HVAC Checklist to prepare for reopening after Corona Virus / Covid-19 shutdown.

      As we head towards the new normal, during Corona Virus, many businesses are considering a return to work in offices and workspaces that may have been closed for up to three months.

      Government Guidance and Heating, Ventilation and Air Conditioning (HVAC) governing body BESA have…

      more >
    • Work has been completed on the refurbishment of Greenbank House, in the Greenbank Complex in South Liverpool. It’s a project we were delighted to win when we announced it here.

      The scope of our work involved the installation of new heat recovery ventilation, LPHW heating & radiators and domestic hot water via a skid-mounted…

      more >
    • In this post, we will look at some of the options open to you when considering plant room upgrades. We’ll look at the financials and the main choices you face.

      The technology available within a plant room has changed dramatically over the last 20 plus years. We see many that still have older commercial boilers built from cast iron. Newer…

      more >
    • Covid-19 Statement

      We appreciate that you may be concerned about the impact of Coronavirus (COVID-19) on Kimpton Energy Solutions, our people and our how we work with you.

      Firstly, we would like to convey our sympathies to anyone within your own circle of colleagues, friends and family that may have already been adversely affected.

      Please be assured that we have a robust Business…

      more >
    • The work is beginning in the Kingsway Tunnel on the £3m project to replace the gravity and pumped drainage pipework. The scale of the project is made clear when you look at the sheer scale of the tunnel system. There are two 9.6m diameter bores and a tunnel length of 2.5km. It’s the second-longest road tunnel in the UK,…

      more >

    Interested in our services?

    Enquire Now


    What our customers say

    • Kimpton Energy Solutions have provided a reliable and helpful service at Dover and Philharmonic Court since they were opened in 2014 /15. A good working relationship is maintained with the service engineers and having a key account manager who is responsive and maintains regular communication has been a key factor in service provision.Having a…

    • Kimptons provided a ‘planned maintenance schedule’ to suit our academic year requirements and maintained the dates set out. Their engineers were always well presented and aware of how to conduct themselves within our environment. They were all trained and knowledgeable on the various items of equipment they came to work on. Mr Mike Pickles,…

    • We are happy with the service Kimptons have provided over the years. Their engineers are local and have great knowledge of our systems. We have built up an excellent working relationship with service engineers along with their office staff. Mr Kevin Foy, Notre Dame College

    • The Kimpton engineers on site are always accommodating to requests from the estates team with regards to heating, ventilation and air conditioning issues. The planned maintenance schedule has developed over the years and works well throughout the year. Having a key account manager who attends site on a weekly basis provides an excellent line…

    • The installation will improve the comfort conditions in several areas of the school servicing both pupils and staff. We are very experienced in undertaking projects in these conditions were flexibility and careful scheduling is key and this was crucial to our appointment on this contract.

    • We have been using TKR Services since their inception and during that time they proved to be not only commercially competitive, but also, looking from an Engineers point of view they have strived to provide the highest quality work.

    • The Plaza is a showpiece building for Bruntwood in Liverpool and we have since made it our own headquarters in the city. To reflect this, we needed to ensure that the fit out was of the highest quality, whilst maintaining the high levels of service our tenants expect from Bruntwood.