We have already shown you what the finished floors in the Capital Building look like when the Kimpton team have completed their work.
In this post, We’ll look at the job in progress, so you can see what is under the hood. As with much of our HVAC work, by the time the job is finished, most of our…
more >24th March 2022
Kimpton have been appointed by the Radisson Blu Liverpool to service and maintain all of their HVAC assets.
Located on Old Hall Street, close to the Capital Building, the hotel is a 4* deluxe hotel and has 194 guest bedrooms as well as a full spa and fitness centre with Gym, Swimming pool, sauna and steam rooms….
more >10th March 2022
We’ve talked a fair bit about our work inside the Capital Building on the Liverpool waterfront. Located on Old Hall Street, In the heart of the business district, the Capital Building is the largest Grade A office building in Liverpool City Centre. Originally opened in 1976 as the purpose-built headquarters of Royal Insurance, it’s a well-known landmark on the…
more >3rd December 2021
In this short piece, we will explain in simple terms how to improve an EPC Rating for commercial property. We’ll look at what it is, why you need to do it, the financial risk of non-compliance and then the step by step guide to the most cost-effective routes to compliance and then touch on future-proofing for future legislation.
5th November 2021
Listed buildings present a whole series of challenges when it comes to refurbishment projects and the work we recently completed at Abbey School in Chester had some new ones that the team had never seen before, despite completing hundreds of similar projects.
Abbey School in Chester is a day and residential independent special school for children and…
more >12th October 2021
Laurence Deacon Court is a development of five sheltered housing units with 70 one and two-bedroom apartments and bungalows. Some of these are mobility standard properties. Built-in 1981, it is operated by Alpha Living, a not-for-profit housing association that focuses on independent living for the over 55’s. They have over 860 apartments across 11 local authorities….
more >2nd October 2021
We’re delighted to announce that we have been appointed by GMI Construction for the mechanical services package in the £40m new build student accommodation project on Carlton Hill in Leeds. The new build consists of 604 student rooms in 10 and 11-bed apartment clusters and is 15 storeys at its highest point. It will replace a…
more >17th June 2021
One of the most common questions that businesses are asking is how do you decarbonise your business? We’ve probably all heard the question and know a little about what it means, but what does it mean for us as business operators and what can we do about it?
The UK Government announced on 20th April 2021 that it…
more >27th May 2021
The Kimpton team recently completed another boiler room replacement. This one at Shoreside Primary School.
Shoreside primary school is a small, friendly primary school with 210 pupil capacity in Ainsdale, Southport. In 2018 it became part of the Rainbow Education Multi Academy Trust, which is a family of six schools across the North West.
The school caters for…
more >20th May 2021
With the talk about gas boilers being discontinued in coming years, we’re often asked how does a heat pump work? in this short post, we’ll explain all.
Our project in Queensferry, working on the new Pupil Referral Unit at Plas Derwyn & Queensferry CP and the extension and refurbishment of the existing Plas Derwyn & Queensferry CP Primary School…
more >6th May 2021
The Kimpton team, working with partners completed a boiler room upgrade and the CIF scheme for school improvement.
Hermitage School is a primary school in Holmes Chapel, Cheshire that opened in 1970. It caters for around 210 children aged 4-11 years. As a purpose-built school, sitting on a large green site, the layout still works well, with eight teaching spaces,…
more >15th April 2021
Designing and creating process cooling systems is an important part of the Kimpton business. It is the perfect example of why working in the plumbing industry, is nothing if it isn’t varied.
In this project, the small works team have been working with Hardy UK in Liverpool. They are one of those companies that if you do not work in…
more >25th March 2021
Lockdown has been a time to deliver a number of projects that are made far easier when the venue is closed. One such job is the work we completed at the stunning Liverpool Philharmonic. Work has been underway for some time to restore the original Rushworth and Dreaper Organ, originally installed in 1939.
According to the Philharmonic,…
more >25th February 2021
Kimpton Energy Solutions have been appointed by Kier Regional Building North West to deliver the mechanical and electrical services for a new Pupil Referral Unit at Plas Derwyn & Queensferry CP as well as for the extension and refurbishment of the existing Plas Derwyn & Queensferry CP Primary School.
The work will all be based around the existing Queensferry Campus…
more >29th October 2020
The Capital Building, or to use its original name, New Hall Place, is a 13 storey building in the Commercial District in Liverpool. Because of its sandy-coloured exterior and waterfront location, it’s often known locally, as the Sand Castle. Originally built in 1974 for Royal Insurance, it incorporates a section of the original ‘walkways in the sky’ project that…
more >15th June 2020
In our previous post, we shared the detailed checklist for an entire HVAC system when you are preparing to reopen your office or business after a long shutdown.
One of the key elements to the checklist was to change filters throughout the system to ensure they were safe, clean and not harbouring bacteria that will have…
more >6th May 2020
In this post, we will look at some of the options open to you when considering a Plant Room Refurbishment. We’ll look at the financials and the choices you face.
The technology available within a plant room has changed dramatically over the last 20 plus years. We see many that still have older commercial boilers built from cast iron. Newer…
more >12th March 2020
The work is beginning in the Kingsway Tunnel on the £3m project to replace the gravity and pumped drainage pipework. The scale of the project is made clear when you look at the sheer scale of the tunnel system. There are two 9.6m diameter bores and a tunnel length of 2.5km. It’s the second-longest road tunnel in the UK,…
more >2nd December 2019
We are now just 36 days away from the stunning Carden Park Spa opening its doors to an expectant public. The new £10m spa, stretches over 4,500sq.m and includes two large vitality pools, a beauty lounge and relaxation spaces.
Outside, there also the huge spa garden that’s designed to bring you closer to the natural beauty…
more >24th October 2019
We’ve just completed a project at a very large process water-cooled fibreglass plant which is another one that’s a little out of the ordinary and involves some very large format pipefitting. There are two systems running close to each other. The one near the roof carries compressed air and runs through 350mm diameter pipes. The external system…
more >17th October 2019
If you’re paying for a commercial boiler service are you sure you’re actually getting a commercial boiler service?
This is a slightly tough subject to raise, as it’s one the entire industry know about, but aren’t saying much, as the prices being paid for servicing in the consumer sector are falling through the floor. We can…
more >1st August 2019
Matt Breakwell has joined Kimpton as Business Development Manager. He joins from Warmer Energy in Liverpool, where he worked in a similar role.
He brings a wealth of senior management experience having worked in roles around the construction and development industry for many years.
4th July 2019
The Kimpton Team are on site completing a chiller replacement project on a 20 year old R22 based Chiller Unit made by York, at Adient in Ellesmere Port, Wirral. Adient is a global leader in automotive seating, that works with all major car makers around the UK and beyond. The chiller supplies fan…
more >2nd May 2019
The Kimpton Maintenance Team have just completed a boiler room replacement project in Liverpool and it’s a little different to most of the many thousands we have completed before. Here’s the story.
The Frances Mary Lescher Building (FML) within the Hope Park campus is the centre of the academic, administrative and conference activity of the…
more >8th April 2019
Why a chilled water system needs a permanent treatment regime
A closed loop chilled water system is often used to generate the cool air for an air conditioning system for a large scale office or industrial application, such as within a data centre.
As the name ‘closed loop’ implies, the… more >
5th April 2019
With our many
4th April 2019
One of the questions we are asked most often as heating engineers, is ‘when does a boiler need replacing?’. On the surface, this is an easy question, but in reality, there are a huge number of variables that can decide on the correct answer.