  • Industrial Pipework in the Process Industry

    At Kimptons, we work on quite a number of commercial plumbing projects on process site of all sizes and across all sorts of industries. It’s where we believe we are stronger than many as we have honed our skills on the many process projects we delivered over our 50 years. Interestingly, the skills we have learned on the bigger industrial pipework projects have allowed us to deliver with even greater efficiency on all of the smaller projects.

    The principles of moving air, water and other gases and liquids safely, are all broadly the same whatever the industry, it’s just the scale of operations that changes so completely between top end commercial and domestic style work.

    So as you can imagine, many of our most experienced team members love it when they get the chance to work on some of the very biggest projects. Big, heavy industrial projects that push the scales to new limits. This latest one shown here is for a fibreglass insulation manufacturing plant in the UK.

    The 14 inch steel header pipe being rigged to fit to the existing system

    The project involved the design, fabrication and installation of an extension to the existing 350mm steel header, to allow for two additional compressor units to be added into the system as back-ups.

    The challenges

    The challenges were obvious.

    The header extension which is almost big enough for a human to crawl through, made of mild steel weighs in at over 500kg and needs to be fitted at the top of the system – conveniently at a height of 30m. This is then to be connected to the two compressor units at floor level via over 20m lengths of 150mm stainless pipework. The header unit carries three pumps to move air around the factory to power the production processes.

    Heavy lifting gear to lift the steel header into position with connection into existing piepework

    The first phase of this supersized industrial pipework project has been delivered as you can see from these images and we will report back when the rest of the installation has been completed.

    industrial pipework with the header pipe extension is secured and in place.

    «Back to Blog

    What our customers say

    • Kimpton Energy Solutions have provided a reliable and helpful service at Dover and Philharmonic Court since they were opened in 2014 /15. A good working relationship is maintained with the service engineers and having a key account manager who is responsive and maintains regular communication has been a key factor in service provision.Having a…

    • Kimptons provided a ‘planned maintenance schedule’ to suit our academic year requirements and maintained the dates set out. Their engineers were always well presented and aware of how to conduct themselves within our environment. They were all trained and knowledgeable on the various items of equipment they came to work on. Mr Mike Pickles,…

    • We are happy with the service Kimptons have provided over the years. Their engineers are local and have great knowledge of our systems. We have built up an excellent working relationship with service engineers along with their office staff. Mr Kevin Foy, Notre Dame College

    • The Kimpton engineers on site are always accommodating to requests from the estates team with regards to heating, ventilation and air conditioning issues. The planned maintenance schedule has developed over the years and works well throughout the year. Having a key account manager who attends site on a weekly basis provides an excellent line…

    • The installation will improve the comfort conditions in several areas of the school servicing both pupils and staff. We are very experienced in undertaking projects in these conditions were flexibility and careful scheduling is key and this was crucial to our appointment on this contract.

    • We have been using TKR Services since their inception and during that time they proved to be not only commercially competitive, but also, looking from an Engineers point of view they have strived to provide the highest quality work.

    • The Plaza is a showpiece building for Bruntwood in Liverpool and we have since made it our own headquarters in the city. To reflect this, we needed to ensure that the fit out was of the highest quality, whilst maintaining the high levels of service our tenants expect from Bruntwood.