    • The team working on the £5m refurbishment of the Capital Building, recently went over and above to find community schemes and charities that could make use of the carpet tiles that we’ve been reclaiming as part of the project. It’s the largest office space in Liverpool and due to reconfiguring the floor plates of the offices, they could not…

      more >
    • In this short piece, we will explain in simple terms how to improve an EPC Rating for commercial property. We’ll look at what it is, why you need to do it, the financial risk of non-compliance and then the step by step guide to the most cost-effective routes to compliance and then touch on future-proofing for future legislation.

      What is…

      more >

    • Kimpton O&M Manuals

      There are O&M Manuals and there are Kimpton O&M Manuals

      With most projects, when they draw to a close, the team put together O&M manuals to hand over to the client. An O&M Manual brings together all of the paperwork for the operation and maintenance of the entire systems for the building. They can be quite weighty documents and being…

      more >
    • When we normally announce a new starter with Kimpton, we talk about what first attracted them to the business. With Steve Turner however, it’s slightly different, as Steve is actually returning to the business after a 37-year break. Back in 1984 Steve’s first job after school was as a Youth Trainee with the EA Kimpton. It was this business…

      more >
    • The Kimpton team have recently completed an interesting job on the roof of Liverpool John Moores University, in the centre of the city and close to the river. The job was to replace the coils inside Carrier Aquaforce Chillers. These chillers feed the Air handling Units (AHU’s) which cool the whole of the eight-storey building with chilled air.

      One…

      more >
    • We’ve written a lot recently about reopening offices and the process you need to go through to properly recommission the air conditioning system in your office or workplace.

      But that still leaves the question unanswered ‘is it safe (or advisable) to use my air conditioning in my office or workplace?’

      Is it safe, am I putting my colleagues at risk…

      more >
    • In our previous post, we shared the detailed checklist for an entire HVAC system when you are preparing to reopen your office or business after a long shutdown.

      One of the key elements to the checklist was to change filters throughout the system to ensure they were safe, clean and not harbouring bacteria that will have…

      more >
    • We’ve just completed a project at a very large process water-cooled fibreglass plant which is another one that’s a little out of the ordinary and involves some very large format pipefitting. There are two systems running close to each other. The one near the roof carries compressed air and runs through 350mm diameter pipes. The external system…

      more >
    • If you’re paying for a commercial boiler service are you sure you’re actually getting a commercial boiler service?

      This is a slightly tough subject to raise, as it’s one the entire industry know about, but aren’t saying much, as the prices being paid for servicing in the consumer sector are falling through the floor. We can…

      more >
    • One of the questions we are asked most often as heating engineers, is ‘when does a boiler need replacing?’. On the surface, this is an easy question, but in reality, there are a huge number of variables that can decide on the correct answer.

      Ten signs that show your boiler may need replacing.


    What our customers say

    • Kimpton Energy Solutions have provided a reliable and helpful service at Dover and Philharmonic Court since they were opened in 2014 /15. A good working relationship is maintained with the service engineers and having a key account manager who is responsive and maintains regular communication has been a key factor in service provision.Having a…

    • Kimptons provided a ‘planned maintenance schedule’ to suit our academic year requirements and maintained the dates set out. Their engineers were always well presented and aware of how to conduct themselves within our environment. They were all trained and knowledgeable on the various items of equipment they came to work on. Mr Mike Pickles,…

    • We are happy with the service Kimptons have provided over the years. Their engineers are local and have great knowledge of our systems. We have built up an excellent working relationship with service engineers along with their office staff. Mr Kevin Foy, Notre Dame College

    • The Kimpton engineers on site are always accommodating to requests from the estates team with regards to heating, ventilation and air conditioning issues. The planned maintenance schedule has developed over the years and works well throughout the year. Having a key account manager who attends site on a weekly basis provides an excellent line…

    • The installation will improve the comfort conditions in several areas of the school servicing both pupils and staff. We are very experienced in undertaking projects in these conditions were flexibility and careful scheduling is key and this was crucial to our appointment on this contract.

    • We have been using TKR Services since their inception and during that time they proved to be not only commercially competitive, but also, looking from an Engineers point of view they have strived to provide the highest quality work.

    • The Plaza is a showpiece building for Bruntwood in Liverpool and we have since made it our own headquarters in the city. To reflect this, we needed to ensure that the fit out was of the highest quality, whilst maintaining the high levels of service our tenants expect from Bruntwood.