• 0151 343 1963

  • Blog Archive

    • Designing and creating process cooling systems is an important part of the Kimpton business. It is the perfect example of why working in the plumbing industry, is nothing if it isn’t varied.

      In this project, the small works team have been working with Hardy UK in Liverpool. They are one of those companies that if you do not work in…

      more >
    • The Capital Building, or to use its original name, New Hall Place, is a 13 storey building in the Commercial District in Liverpool. Because of its sandy-coloured exterior and waterfront location, it’s often known locally, as the Sand Castle. Originally built in 1974 for Royal Insurance, it incorporates a section of the original ‘walkways in the sky’ project that…

      more >
    • The Incredible Edible movement started back in 2008 with the aim of creating kinder, more confident, more connected communities, all united around the power of growing food together. There are now over 100 members within the network in the UK and over 1,000 worldwide. It has made such an impact, that one of the two…

      more >
    • In this post, we will look at some of the options open to you when considering a Plant Room Refurbishment. We’ll look at the financials and the choices you face.

      The technology available within a plant room has changed dramatically over the last 20 plus years. We see many that still have older commercial boilers built from cast iron. Newer…

      more >
    • We’ve just completed a project at a very large process water-cooled fibreglass plant which is another one that’s a little out of the ordinary and involves some very large format pipefitting. There are two systems running close to each other. The one near the roof carries compressed air and runs through 350mm diameter pipes. The external system…

      more >
    • One of the questions we are asked most often as heating engineers, is ‘when does a boiler need replacing?’. On the surface, this is an easy question, but in reality, there are a huge number of variables that can decide on the correct answer.

      Ten signs that show your boiler may need replacing.


    What our customers say

    • Kimpton Energy Solutions have provided a reliable and helpful service at Dover and Philharmonic Court since they were opened in 2014 /15. A good working relationship is maintained with the service engineers and having a key account manager who is responsive and maintains regular communication has been a key factor in service provision.Having a…

    • Kimptons provided a ‘planned maintenance schedule’ to suit our academic year requirements and maintained the dates set out. Their engineers were always well presented and aware of how to conduct themselves within our environment. They were all trained and knowledgeable on the various items of equipment they came to work on. Mr Mike Pickles,…

    • We are happy with the service Kimptons have provided over the years. Their engineers are local and have great knowledge of our systems. We have built up an excellent working relationship with service engineers along with their office staff. Mr Kevin Foy, Notre Dame College

    • The Kimpton engineers on site are always accommodating to requests from the estates team with regards to heating, ventilation and air conditioning issues. The planned maintenance schedule has developed over the years and works well throughout the year. Having a key account manager who attends site on a weekly basis provides an excellent line…

    • The installation will improve the comfort conditions in several areas of the school servicing both pupils and staff. We are very experienced in undertaking projects in these conditions were flexibility and careful scheduling is key and this was crucial to our appointment on this contract.

    • We have been using TKR Services since their inception and during that time they proved to be not only commercially competitive, but also, looking from an Engineers point of view they have strived to provide the highest quality work.

    • The Plaza is a showpiece building for Bruntwood in Liverpool and we have since made it our own headquarters in the city. To reflect this, we needed to ensure that the fit out was of the highest quality, whilst maintaining the high levels of service our tenants expect from Bruntwood.