12th March 2020
The work is beginning in the Kingsway Tunnel on the £3m project to replace the gravity and pumped drainage pipework. The scale of the project is made clear when you look at the sheer scale of the tunnel system. There are two 9.6m diameter bores and a tunnel length of 2.5km. It’s the second-longest road tunnel in the UK,…
more >