    In this post, we will look at some of the options open to you when considering plant room upgrades. We’ll look at the financials and the main choices you face.

    The technology available within a plant room has changed dramatically over the last 20 plus years. We see many that still have older commercial boilers built from cast iron. Newer condensing boilers are generally designed to last between 15-20 years with regular servicing. Our service engineers tell us that whilst they are often still called out to service boilers approaching 30 years old, there are few that are delivering heat at anywhere near the efficiency of a modern boiler system.

    Plant Room upgrade by Kimpton Energy Solutions

    An older cast iron boiler will normally operate with an efficiency as low as 50% with the highest being up to 78% efficient. A 15 year old boiler could have been as high as 84% efficient when new. A brand new stainless steel commercial boiler however, can operate at efficiencies of 99%.

    What this means in real terms, is that a new commercial boiler system will be a minimum of 27% more efficient than even the best old cast iron one. They could even be as high as 98% more efficient, even if it has been properly maintained throughout its life. If it’s been neglected, this efficiency gain could be significantly more.

    So there is an opportunity to upgrade a plant room and deliver serious ongoing savings. In some cases, a plant room built ten or more years ago could potentially be completely replaced out of the savings it could deliver over the following five years, when compared to the existing plant provision.

    If you are unsure about whether your plant room does need an upgrade, we talked about the ten signs your commercial boiler may need replacing over here.

    Plant room upgrades are a great way to save money into the long term

    Options for plant room upgrades

    Switch to CHP

    For larger applications, the switch to a CHP (Combined Heat and Power) unit, could be a viable option as long as it is properly specified.

    Low carbon solutions have advanced so much of late, that the selection of the CHP (Combined Heat and Power) unit, can take the strain for all of the building’s baseload and be supported by other lower cost options to deliver savings and huge efficiencies for years to come. All too often our maintenance engineers visit sites where CHP’s aren’t performing properly and this is nearly always to do with over or under speccing the size of the unit. Too big and it never gets going, too small and it’s always overrun.

    A CHP, when it’s been specified correctly, will deliver the absolute peak efficiency for the pattern of demand in a modern education, healthcare, office or residential accommodation unit.

    Condensing boiler systems
    With 98% efficiency available, these are an obvious solution to deliver cost savings and minimal maintenance. A commercial grade boiler is generally considered to be above 70kW output, but when cascaded together can often be 400kW or as high as 2,400kW and above. The main reason a condensing boiler is so much more efficient than a non-condensing model is that exhaust gas is recycled through the condensing heat exchanger. Hence the name. This also results in far lower Co2 emissions and lower ongoing running costs.

    Maintenance of existing plant room after its been upgraded

    Internal or external Plant room upgrades

    There are also options to upgrade within the existing space or create a new external container for the pant room.

    Upgrading the existing plant room is the obvious option as long as the space is suitable. You first need to remove the old hardware, before installing the new one. To avoid interruption of supply, we often bring in temporary heat systems, like the one we did recently for our friends at Claire House here.

    Our sister company, Kimpton Acoustics also has a new option available and that is for an externally sited acoustic plant room. This offers the advantage of a clean site to work with, a purpose-designed space in which to install the kit and the ability to site the plant room in a location that does not affect the residents of the space with noise or disruption.

    But there is also a bigger advantage again and that is to be able to fully fit out the plant room, before delivery. When it arrives on site, with some previous preparation, it can be almost fully ‘plug and play’. So there is very little supply interruption to deliver a fully functional, super efficient plant room upgrade.

    Why talk to Kimpton about plant room upgrades?

    There’s been a fundamental shift towards low carbon and renewable solutions, with CHP being just one of the options available. As a business, we predicted this change many years ago and were very early adopters in the renewable sector. We have a deep knowledge of what delivers long term cost-effective, lower carbon, cost-efficient energy.

    It’s our belief that in the longer term, renewables and low carbon won’t be anything other than the norm. If this carries through to the end customers, then they too will begin to demand working or living spaces that harness renewable energy and turn away from places that use higher carbon alternatives.

    At present, Grade A buildings and offices tend to be specced with raised floors, suspended ceilings, lifts, air conditioning and high specification furnishings. The provision of renewable technology to deliver the heating and cooling is currently NOT part of this specification. We feel this may be changing and are in prime position to deliver this change.

    So we believe that here at Kimpton’s we are your partner of choice for an honest assessment, renewable plant room upgrade or refurbishment and the long term effective maintenance of your plant and mechanical services.

    «Back to Blog

    What our customers say

    • Kimpton Energy Solutions have provided a reliable and helpful service at Dover and Philharmonic Court since they were opened in 2014 /15. A good working relationship is maintained with the service engineers and having a key account manager who is responsive and maintains regular communication has been a key factor in service provision.Having a…

    • Kimptons provided a ‘planned maintenance schedule’ to suit our academic year requirements and maintained the dates set out. Their engineers were always well presented and aware of how to conduct themselves within our environment. They were all trained and knowledgeable on the various items of equipment they came to work on. Mr Mike Pickles,…

    • We are happy with the service Kimptons have provided over the years. Their engineers are local and have great knowledge of our systems. We have built up an excellent working relationship with service engineers along with their office staff. Mr Kevin Foy, Notre Dame College

    • The Kimpton engineers on site are always accommodating to requests from the estates team with regards to heating, ventilation and air conditioning issues. The planned maintenance schedule has developed over the years and works well throughout the year. Having a key account manager who attends site on a weekly basis provides an excellent line…

    • The installation will improve the comfort conditions in several areas of the school servicing both pupils and staff. We are very experienced in undertaking projects in these conditions were flexibility and careful scheduling is key and this was crucial to our appointment on this contract.

    • We have been using TKR Services since their inception and during that time they proved to be not only commercially competitive, but also, looking from an Engineers point of view they have strived to provide the highest quality work.

    • The Plaza is a showpiece building for Bruntwood in Liverpool and we have since made it our own headquarters in the city. To reflect this, we needed to ensure that the fit out was of the highest quality, whilst maintaining the high levels of service our tenants expect from Bruntwood.