3rd June 2021
When we normally announce a new starter with Kimpton, we talk about what first attracted them to the business. With Steve Turner however, it’s slightly different, as Steve is actually returning to the business after a 37-year break. Back in 1984 Steve’s first job after school was as a Youth Trainee with the EA Kimpton. It was this business…
more >12th March 2020
The work is beginning in the Kingsway Tunnel on the £3m project to replace the gravity and pumped drainage pipework. The scale of the project is made clear when you look at the sheer scale of the tunnel system. There are two 9.6m diameter bores and a tunnel length of 2.5km. It’s the second-longest road tunnel in the UK,…
more >25th October 2018
The Turner Home (formerly The Turner Memorial Home) on Dingle Lane, Toxteth Liverpool was founded in 1884 for the care of sick and disadvantaged men. It has continued to function in this role as a registered residential and nursing home for men ever since. The building is listed by English Heritage as a designated Grade II listed building. This…
more >23rd August 2018
We are delighted to announce that we have recently been awarded the mechanical package for the Welsh Ambulance Service Trust headquarters. The scope of the project will be the installation of a new HVAC system within the complete refurbishment of an existing office block.
The challenges the team face are…
more >2nd August 2018
Following on from the successful completion of Greenbank Blocks C & D we are very pleased to have secured the £700k M&E package for the refurbishment on the grade II listed Greenbank house. The main scope of the works is HVAC and will involve the installation of new heat recovery ventilation, LPHW heating & radiators, domestic hot…
more >20th July 2018
At Kimpton Energy Solutions, we are continually striving to improve and develop the level of service we provide to our clients. In 2008 we teamed up with a software company to develop our own Field Service Management (FSM) software. The aim was to help us to deliver a more consistently professional service to our customers whilst allowing us to…
more >9th April 2018
The Kimpton team have just commenced on site at the new Hollis Croft Student Accommodation project in Sheffield. It’s a £1.8m Mechanical Services project we announced here and we expect to be on site for the next 18 months.
Over the coming months, we’ll be revisiting the project and sharing updates as there are quite a few interesting innovations in…
more >22nd March 2018
We have just completed a major oil tank replacement project on a site near Blackpool. Our scope of works was to remove existing oil tanks which were installed over 20 years ago and had become corroded and were leaking from the tank and the pipework that lead to and from it.
5th March 2018
Congratulations to Paul Davies, Craig Kitching and Mark Farrell on passing their more >
15th February 2018
Kimpton are proud to confirm that we have achieved level 3 Gold Constructionline Membership.
Constructionline is the UK’s largest register of contractors, consultants and material suppliers for the construction industry. With over 10,000 key decision makers from over 3,800 buying organisations. However, to become a Gold level member, there are new standards to be achieved by the organisation.
The first of…
more >8th February 2018
The Air Conditioning Team at Kimpton have been busy and just completed a contract to completely renovate the air conditioning system at Bangor Job Centre Plus.
It was a two-stage process, with the first part seeing us safely decommission and remove the existing Toshiba system which consists of six R22 based units.
25th January 2018
Kimpton Energy Solutions have secured a £1.8m Design and Build Mechanical contract for Hollis Croft Student Development, in the heart of the city centre, Sheffield. The location, just off Broad lane is one of the few areas designated for tall buildings and will house a new student accommodation hub with nearly 1,000 beds across three…
more >10th January 2018
We recently completed the installation of two cold water tanks of 20,000 and 30,000 litres at The Capital Building, Liverpool. The old tank cold water system was neither big enough or able to meet the changing demands of the refurbished building. The new tanks have been designed to improve resilience, offer far greater sureness of supply and to comply…
more >21st December 2017
When you have a large commercial, industrial or multi-story living accommodation without sufficient isolating valves around the various circuits, it will typically be impractical to shut off the flow of heating or hot water to the whole building to carry out pipe repairs and alterations.In these instances, it is sensible to use pipe freezing to prevent…
more >24th April 2017
Kimpton is an official Business Solutions Partner of Mitsubishi.
We enjoy a close working relationship with this award-winning corporation and we’re excited to pass the benefits on to our customers!
Why not get in touch and learn about our high-quality services?
Our technicians are experienced in a wide range of HVAC applications and they know Mitsubishi’s equipment inside and out….
more >1st December 2016
Kimpton offer a wide range of services from acoustic engineering to air conditioning installation. Our team consists of extremely experienced and knowledgeable staff who know exactly what our customers need. We can provide full turnkey solutions and work from concept right through to installation.
Here are 3 services that we offer.
With over 40 years’ experience working with…
more >