• 0151 343 1963

  • Blog Archive

    • We are delighted to announce a new senior appointment within the Finance Team at Kimpton’s Bromborough office.

      Linzi Sheard joins as Financial Controller after relocating from London. Her background in consultancy businesses will bring a new perspective to the finance team.

      Having completed a Law degree, Linzi went on to complete her… more >

    • The Kimpton team have just commenced on site at the new Hollis Croft Student Accommodation project in Sheffield. It’s a £1.8m Mechanical Services project we announced here and we expect to be on site for the next 18 months.

      Over the coming months, we’ll be revisiting the project and sharing updates as there are quite a few interesting innovations in…

      more >
    • We have just completed a major oil tank replacement project on a site near Blackpool. Our scope of works was to remove existing oil tanks which were installed over 20 years ago and had become corroded and were leaking from the tank and the pipework that lead to and from it.

      The first...</p> <a class=more >

    • The Air Conditioning Team at Kimpton have been busy and just completed a contract to completely renovate the air conditioning system at Bangor Job Centre Plus.

      It was a two-stage process, with the first part seeing us safely decommission and remove the existing Toshiba system which consists of six R22 based units.

      Close up of the...</p> <a class=more >

    • Kimpton Energy Solutions have secured a £1.8m Design and Build Mechanical contract for Hollis Croft Student Development, in the heart of the city centre, Sheffield. The location, just off Broad lane is one of the few areas designated for tall buildings and will house a new student accommodation hub with nearly 1,000 beds across three…

      more >
    • We recently completed the installation of two cold water tanks of 20,000 and 30,000 litres at The Capital Building, Liverpool. The old tank cold water system was neither big enough or able to meet the changing demands of the refurbished building. The new tanks have been designed to improve resilience, offer far greater sureness of supply and to comply…

      more >
    • We are pleased to announce that we now have a lifesaving defibrillator in our offices, the defibrillator will be shared between ourselves and 3…

      more >
    • In preparation for the winter break where we all ‘enjoy’ a few days of rest and recuperation with our families, we wanted to share our Christmas opening times for December and January 2017.

      Kimpton Energy Solutions

      We close on Friday 22nd December and reopen on Monday 8th January fully refreshed and ready to go.

      Kimpton Maintenance Solutions

      Opening times are slightly different here and…

      more >

    What our customers say

    • Kimpton Energy Solutions have provided a reliable and helpful service at Dover and Philharmonic Court since they were opened in 2014 /15. A good working relationship is maintained with the service engineers and having a key account manager who is responsive and maintains regular communication has been a key factor in service provision.Having a…

    • Kimptons provided a ‘planned maintenance schedule’ to suit our academic year requirements and maintained the dates set out. Their engineers were always well presented and aware of how to conduct themselves within our environment. They were all trained and knowledgeable on the various items of equipment they came to work on. Mr Mike Pickles,…

    • We are happy with the service Kimptons have provided over the years. Their engineers are local and have great knowledge of our systems. We have built up an excellent working relationship with service engineers along with their office staff. Mr Kevin Foy, Notre Dame College

    • The Kimpton engineers on site are always accommodating to requests from the estates team with regards to heating, ventilation and air conditioning issues. The planned maintenance schedule has developed over the years and works well throughout the year. Having a key account manager who attends site on a weekly basis provides an excellent line…

    • The installation will improve the comfort conditions in several areas of the school servicing both pupils and staff. We are very experienced in undertaking projects in these conditions were flexibility and careful scheduling is key and this was crucial to our appointment on this contract.

    • We have been using TKR Services since their inception and during that time they proved to be not only commercially competitive, but also, looking from an Engineers point of view they have strived to provide the highest quality work.

    • The Plaza is a showpiece building for Bruntwood in Liverpool and we have since made it our own headquarters in the city. To reflect this, we needed to ensure that the fit out was of the highest quality, whilst maintaining the high levels of service our tenants expect from Bruntwood.