Case Studies

Acoustic Enclosures Stilling Fleet Coalfield

Acoustic Enclosures Stilling Fleet Coalfield

Project Details

The Client: UK Coal
Customer: Clarke Energy
Service: Acoustic Enclosure
Project Completion: May 2005

 

The Project

Stillingfleet was part of the Selby coalfield in North Yorkshire, one of the biggest and most sophisticated mining operations in Europe. Following the closure of the mine the leaking mine gas, which cannot be retained within the mine, leaks to atmosphere. UK Coal estimated there to be 12 million cubic metres of gas over a 10 year period which could be used to generate electricity.

Four 3.0 megawatt generators were installed to convert the mine gas to electricity, but in order to meet planning guidelines Kimpton had to design and install acoustic enclosures that would not only reduce the noise levels but also were capable of ventilating and cooling the generator sets. Kimpton’s knowledge and experience of generator application design parameters was critical to ensuring the final acoustic enclosures met all the client’s requirements.

Creating the
sustainable building
environments of tomorrow

Quick enquiry

If you would like to discuss any of our services, please call 0151 343 1963 or complete the form below and we will be in touch shortly.

    Creating the
    sustainable building
    environments of tomorrow