Containerised Plant Rooms

Kimpton design and build bespoke containerised plant for almost any application. Whether it’s to house heating, cooling or any other form of plant on a temporary or permanant basis, we will deliver.

Contact the Kimpton Containerised Plant team

Containerised Plant Case Studies

For many years, Kimpton have designed, built and installed containerised plant rooms across the UK. Initially, these were mainly large acoustic containerised plant rooms designed to deliver a fast heating solution with minimal disruption into a housing environment, but increasingly, they are being used by schools and healthcare providers to replace existing boiler rooms that may contain asbestos or oher hazardous materials. This delivers a fast, sensibly price plant room that allows easy ongoing mainenance and a purpose designed spec at a fraction of the price of a brick built replacement.

the Kimpton acoustic plant room on its way to Aberdeen
  • Acoustic

Acoustic Packaged Plant Room – Kincorth District Heating Scheme

Client: Aberdeen Heat and Power Location: Kincorth District Heating Scheme Project: Acoustic Packaged Plant Room Value: £150k This is another acoustic plant room

5 The new acoustic plant room is all loaded up and ready to go
  • Acoustic

Acoustic Plant Room for Aberdeen

The Client Aberdeen Heat and Power were established by Aberdeen City Council in 2002 as an independent not-for-profit company to help address fuel poverty in the

Acoustic Enclosure Maintenance at Langage
  • Acoustic
  • Service/Maintenance

Acoustic Enclosure Maintenance at Langage Power Station

The Client Langage is a combined cycle power plant that started operation in 2010. It’s owned by EP Power Europe and operated by Centrica. The site has two gas-powered

Inside the Packaged Plant Room for Welburn Hall School North Yorkshire
  • Education

Packaged Plant Room for Welburn Hall School North Yorkshire

Client: Tom Willoughby Location: Welburn Hall School Project: Packaged Plant Room Value: £135,000 Background The Kimpton team recently completed a bespoke packaged

Lead image close up detail of the plant room at Cardinal Newman School Warrington
  • Education

Packaged plant boiler room for Cardinal Newman School

Client: Cardinal Newman School Project: Packaged plant boiler room Project Value: £160k Overview Cardinal Newman in Latchford, south of Warrington, is a Catholic

Wirral Grammar School for Boys - Packaged Plant Room by Kimpton
  • Education

Wirral Grammar School for Boys – Packaged Plant Room

Client: Wirral Borough Council Location: Wirral Grammar School for Boys Project: Packaged Plant Boiler room upgrade Project Value: £330k Background Wirral Grammar

  • Education

The Willows School plant room refurbishment

Client: The Willows School Project: Plant room refurbishment Value: £120k Background The Willows Primary School in Ipswich is a member of the Orwell Multi Academy

  • Education

Moorside Academy Plant Room Upgrades

Client: Spie Project Value: £59k Project Completion: October 2021   Scope of Work Moorside High School is a secondary school in Swinton, Manchester, that

  • Education

LJMU Plant room refurbishment

Client: LJMU Plant room refurbishment Project: School of Nursing and Allied Health Value: £750k Background As part of the overall £6.5m project to refurbish the

Hope Park Campus with new Boiler room by Kimpton
  • Education
  • Service/Maintenance

Liverpool Hope University Boiler Room Replacement

The Kimpton Maintenance Team completed a boiler room replacement project in Liverpool and it’s a little different to most of the many thousands we have completed

Eastway Primary boiler room replacement by Kimpton 2
  • Education

Eastway Primary School, Boiler room replacement

Client: Wirral Borough Council Location: Eastway Primary School Project: Boiler room replacement Project Value: £200k Background Eastway Primary is a community

  • Residential
  • Service/Maintenance

Laurence Deacon Court – Plant Room Upgrades

Client: Alpha Homes Customer: Laurence Deacon Court Service: Boiler Room Replacements Project value: £150k Project completion: October 2021   Built in

Alder Hey Childrens
  • Health

Alder Hey Hospital Boiler Decentralisation

Client: Alder Hey Children’s NHS Foundation Trust Project Value: £65k Project Completion: September 2021   In October 2015, the new Alder Hey Children’s

Call the Kimpton Containerised Plant team

Kimpton Containerised Plant News

Lead image close up detail of the plant room at Cardinal Newman School Warrington

Packaged Plant Room for Cardinal Newman High School

Cardinal Newman Catholic High School in Latchford, south of Warrington is a vibrant and welcoming Catholic High School. With over 800 students aged 11-16, It first

Packaged plant boiler room arriving on site

Packaged Plant Rooms: A Comprehensive Overview

What Are Packaged Plant Rooms? Packaged plant rooms are self-contained units that house essential mechanical and electrical equipment required for a building’s

The lift is complete amd the acoustic plant room is loaded

Acoustic Plant Room for Kincorth District Heating Scheme

This is another acoustic plant room project for Aberdeen Heat and Power and has just been delivered to site, ready to put into action, serving

Temporary boiler hire emergency boiler hire Liverpool by Kimpton

Temporary Boiler Hire for Commercial Property

Commercial boilers do occasionally fail and when they do, you could be left without heating and/or hot water, while you are waiting for a part, a replacement or a

Tower Hotel in London with Kimpton

£750k plant room upgrade for Tower Hotel London

Kimpton have been appointed to reduce the carbon impact and improve the efficiency of the heating and water systems at the iconic 801-bedroom Tower Hotel in

Alternative view of Cardiff BTR Scheme for Watkin Jones with Mechanical Services by Kimpton

Central Quay Cardiff BTR Scheme

Kimpton have been appointed to deliver the mechanical package for the new BTR Scheme for Watkin Jones and Central Quay Cardiff on the old Brains Brewery site. The

Rathbone Hospital undergoing HVAC work by Kimpton Liverpool

Decarbonisation work begins at Rathbone Hospital

We are proud to announce that we have been appointed by Mitie on behalf of Mersey Care NHS Foundation Trust to complete a £2.8m decarbonisation project across their

rooftop plant after installation with insulated pipework completed

New Chillers for Countess of Chester – Project update

The Kimpton team recently completed a project at the Countess of Chester Hospital to remove redundant plant and completely refit the chiller system that serves the main

Sustainable development at the ACC Arena with Kimpton

Sustainable (re)development

As the M&S Bank Arena and Exhibition Centre Liverpool’s Hard FM Partner, we’re working with the team at ACC Liverpool to support their Sustainability Strategy

PBSA and BTR refurbishment - Studio bedroom with kitchen at Steelworks Sheffield PBSA with mechanical services by Kimpton

The growing demand for PBSA and BTR refurbishment

Back in 2021 we wrote a piece about the changing shape of the UK PBSA (Purpose Built Student Accommodation) and BTR (Build to rent) market and felt that there would be a

When does your commercial boiler need replacement with Kimpton at the Capital Building

When does a commercial boiler need replacing?

When should you replace your commercial boiler and what are your options for replacement? We have written a lot about this in the past, but there have been some major

Plant Room Refurbishment by Kimpton

Plant Room Refurbishment – What you need to know

In this post, we will look at some of the options open to you when considering a Plant Room Refurbishment. We’ll look at the financials and the choices you face. The

The latest containerised plant room leaves the workshop for Aberdeen

Another Acoustic Plant Room delivered

Another Acoustic Plant Room delivered In between the huge jobs we’re working on at Moray East and others, the workshop is keeping busy with

Properties Laurence Deacon court activities 518x400

Laurence Deacon Court – Plant room upgrades

Laurence Deacon Court is a development of five sheltered housing units with 70 one and two-bedroom apartments and bungalows. Some of these are mobility standard

Air conditioning commissioning by Kimpton

Approved Heat Pump Installer Liverpool

Approved Heat Pump Installer for Mitsubishi in Liverpool The senior team at Kimpton recognised the growing and potential importance of heat pumps more than 40 years

lead image showing old and new pipework

Boiler Room replacement – Liverpool Hope University

The Kimpton Maintenance Team have just completed a boiler room replacement project in Liverpool and it’s a little different to most of the many thousands we have

Two new Strebel boilers installed and ready to go with pipework

Boiler room upgrade for Hermitage Primary School

The Kimpton team, working with partners completed a boiler room upgrade and the CIF scheme for school improvement. Hermitage School is a primary school in Holmes

Wind Turbines off New Brighton Burbo Bank decarbonise your business

How to decarbonise your business

One of the most common questions that businesses are asking is how do you decarbonise your business? We’ve probably all heard the question and know a little about what

The framework to hold the pipework for the dry air coolers is installed

Replacement heating and cooling system for the Capital Building

The Capital Building, or to use its original name, New Hall Place, is a 13 storey building in the Commercial District in Liverpool. Because of its sandy-coloured

The business of Student Accommodation

The growth in student accommodation over the past 20 years has been staggering. As a sector, it’s gone from almost non-existent with universities only aiming to offer

Get in touch with the Kimpton Containerised Plant team

Contact us

    Head Office

    Kimpton Ltd,
    Unit 5, Hawkshead Road,
    Greenfields Technology Park,
    Bromborough, Wirral
    CH62 3RJ
     
    T: 0151 343 1963
    F: 0151 343 5900
     
    WHAT3WORDS LOCATION
    beats.maps.drove

    Socials

    Whether you need our help right now or not, why not keep up to date with Kimpton’s recent projects and industry news by following us on social media platforms such as X (Twitter), Linkedin and Facebook, we have a dedicated team who make sure that our social media is kept up to date at all times.

    Creating the
    sustainable building
    environments of tomorrow
    Creating the
    sustainable building
    environments of tomorrow

    Quick enquiry

    If you would like to discuss any of our services, please call 0151 343 1963 or complete the form below and we will be in touch shortly.

      Creating the
      sustainable building
      environments of tomorrow