The Client: Aberdeen Heat & Power
Customer: Torry Project
Service: Containerised Plantrooms
Project Completion: November 2012
Kimpton Energy Solutions were employed by Aberdeen Heat & Power to design and manufacture two bespoke containers to house CHPs’ for two separate district heating schemes in Scotland.
Manufactured at works the containers were constructed from a base frame with acoustic panels secured with H joiners between. The roof comprised an inverted pitch with internal rain pipes to comply with planning. For aesthetics the enclosures were timber clad.
The units were designed to be lifted complete with the CHP installed allowing them to be fully fitted out prior to being shipped to site.