Case Studies

ACC Arena Hard FM Contract

ACC Arena Hard FM Contract

Client: ACC Arena
Project: Hard FM Contract
Project Scope: Hard FM
Project Manager: Andy Morgan

Overview

Having won the Hard FM Contract, our role will to be review all of the existing heating and cooling systems and look to make improvements in line with their own carbon reduction strategy. We will aim to ensure flawless delivery of all services during our contracted period.

Our work

As part of the contract appointment, we are undertaking a thorough review of all the heating and cooling systems to support The ACC Liverpool Group’s carbon reduction plan, that will reduce Co2 impact and ongoing running costs.

One of the first areas for investigation is the fan coils for the chillers that cool the air in the performance spaces.

We’re also starting surveying on the building’s suitability for a Transpired Solar Collector (TSC). The south facing aspect of Exhibition Centre Liverpool makes it a perfect candidate for fitting a TSC system to the building, with the potential to reduce running costs.

Project Management

Andy Morgan from Kimpton said. “Even when we did our initial walk around the site, it was clear that the fan coils were showing signs of corrosion. I believed this was due to them not being correctly coated with Blygold or similar, to give them the additional protection they need to work in a marine environment. We have seen this a lot over the years and correcting this will have an immediate impact as the chillers will run as they should.”

Hard FM Win for Kimpton for the ACC Arena Liverpool

Creating the
sustainable building
environments of tomorrow

Quick enquiry

If you would like to discuss any of our services, please call 0151 343 1963 or complete the form below and we will be in touch shortly.

    Creating the
    sustainable building
    environments of tomorrow