Commercial case studies

Commercial businesses need a fast service with 100% reliability. It's why many of the biggest brands in the north west region rely on Kimpton for their MEP and FM work. From small projects to major overhauls throughout the business, talk to the team you can trust.

  • Public Sector
  • Commercial Fit-Out

39 Old Hall Street, Liverpool – Cat B Commercial Fit-out

Client: Crown Commercial Services Site: 39 Old Hall Street, Liverpool Value: £1.2m Project: Full floor by floor refurbishment Project Manager: Scott

Kimpton delivering the Hard FM Contract Liverpool for Acc Arena
  • Leisure/Hospitality
  • Service/Maintenance

ACC Arena Hard FM Contract

Client: ACC Arena Project: Hard FM Contract Project Scope: Hard FM Project Manager: Andy Morgan Overview Having won the Hard FM Contract, our role will to be

Axis Canteen for TJ Morris mechanical services by Kimpton M&E Liverpool
  • Commercial

Axis Canteen Extension for Home Bargains – Mechanical Services

TJ Morris, owners of Home Bargains, have expanded on their site at Axis Business Park in Gillmoss, Liverpool, as their own business has grown. TJ Morris Ltd, which

Building Refurbishment Bruntwoods - The Plaza
  • Commercial
  • Commercial Fit-Out

Building Refurbishment Bruntwood – The Plaza

The Client A leading name in the property world, Bruntwood owns more than 80 commercial properties in Manchester, Liverpool, Leeds and Birmingham. The company takes a

Working outside to install three new temporary dry air coolers
  • Commercial
  • Commercial Fit-Out

Capital Building, Liverpool – Cat A Refurbishment

Client: Trinistar Investments Site: The Capital Building, Liverpool Value: £7.5m Project: Cat A Refurbishment Project Manager: Scott Bennett Background The

On the very top of the building you can see the cooling system at work
  • Commercial
  • Heritage

Capital Building, Liverpool Full HVAC Replacement

Client: Trinistar Investments Site: The Capital Building, Liverpool Value: £7.5m Project: HVAC Replacement across 13 floors Project Manager: Scott

  • Industry/Technology

Chiller Replacement, Fujitsu Head Office

Client: Fujitsu Project Value: £200k Project Completion: November 2020 Project Manager: Dave Gore Project Overview Kimpton were appointed by Fujitsu to replace a

Final pre launch checks of the Commercial Solar PV by Kimpton
  • Commercial

Commercial Solar PV, Genesis Centre, Stoke on Trent

Client: Northern Trust Project: Genesis Business Centre Solar PV Project Value: £110k Project Scope: Commercial Solar PV Installation Project Manager: Greg

data centre cooling by Kimpton consumer manufacturer
  • Commercial
  • Industry/Technology

Consumer Products Manufacturer

The Client From its roots as a soap manufacturer in the 1890s, this major multi-national has grown to a company offering more than 400 brands across a diverse range of

Conversion of warehouse to open plan office by Kimpton
  • Commercial
  • Commercial Fit-Out

Conversion of warehouse to open plan office

The Client A specialist litigation practice with expertise in claimant, defendant and fraud services, This firm of Solicitors operates out of a regional office located

Daresbury labs
  • Commercial
  • Industry/Technology
  • Service/Maintenance

Daresbury Laboratories HVAC PPM Contract

Daresbury Laboratory opened in 1962 in Halton, Cheshire, close to Warrington. It's a world leader in scientific research in areas as diverse as nuclear physics and

High view of Hitex Solar PV by Kimpton
  • Commercial

Hitex Solar PV Installation

Client: Hitex Location: Ellesmere Port Project: Solar PV Project Manager: Graham Woodward Project Value: £320k Background Hitex Traffic Safety based in Ellesmere

  • Commercial
  • Leisure/Hospitality

I’m a Celebrity Jungle Challenge

Client: MC Construction Project Value: £160k Project Manager: Andy Morgan Overview I'm a Celebrity Jungle Challenge is a brand new Family Entertainment Centre (FEC)

Ingevity Warrington-Plant with AHUs by Kimpton
  • Industry/Technology

Ingevity Warrington – AHU upgrades

Client: Ingevity Location: Warrington Project: AHU replacement and upgrades Project Manager: Matt Clare Project Value: £130k Background Ingevity opened its doors

Jaguar Land Rover, Castle Bromwich
  • Industry/Technology
  • Service/Maintenance

Jaguar Land Rover, Castle Bromwich

Summary Kimpton provided end to end design and installation of an innovative, high specification HVAC solution for two high bay warehouses alongside LPHW and VRF

Leeds tech PBSA development with M&E by Kimpton
  • Residential

Leeds Technology Campus Redevelopment

Client: McAleer & Rushe Project: Leeds Technology Campus Redevelopment Project Value: £4.8m Project Scope: Mechanical and Electrical Services Project

The LIver Building Liverpool with new domestic hot water system by Kimpton
  • Commercial
  • Heritage

Liver Building Domestic Hot Water upgrade

Client: CBRE Location: The Liver Building Project: Domestic Hot Water Decarbonisation Project Manager: Phil Higham Background The Liver Building on Liverpool's

  • Leisure/Hospitality

M&E Services Travelodge Liverpool

Project Details The Client: Travelodge Customer: Marcus Worthington Service: Mechanical Services Project Value: £750,000 Project Completion: March

External LED Lighting upgrades at ACC Arena Liverpool by Kimpton lead
  • Leisure/Hospitality
  • Public Sector

M&S Bank Arena LED Lighting upgrades

Client: ACC Arena Location: Liverpool Waterfront Project: LED Lighting upgrades Project Manager: Greg Percival   LED Lighting upgrades for M&S Bank Arena

Valentine Place with M and E by Kimpton Liverpool
  • Commercial
  • Commercial Fit-Out

Office fit-out – Valentine Place, London

Client: Watkin Jones Project: Office fit-out - Valentine Place, 105 Blackfriars Road Project Value: £1.65m Project Manager: Dave Gore Overview This was very much

Kimpton M&E at Kraft Heinz on Office Modernisation Project
  • Commercial

Office Modernisation Project Kraft Heinz

Summary Kimpton took ownership and responsibility for an entire office modernisation project from asbestos removal to the design and installation of a state of the art

One of the refurbished floors at the Capital Building by Kimpton
  • Commercial
  • Public Sector
  • Commercial Fit-Out

Office Refurbishment over two floors

Client: Mitie/ Home Office Location: Capital Building, Liverpool Project: Office Refurbishment Value: £1.2m Project Managers: Scott Bennett and Phil

Lead image for the male toilets at ACC Arena Liverpool by Kimpton
  • Leisure/Hospitality
  • Commercial Fit-Out

Public Toilets, Staff changing and Shower Rooms

Client: ACC Arena Location: Liverpool Project: Toilets and changing rooms Project Managers: Phil Bowers and Scott Bennett Background The brief was to totally

Collage restaurant Radisson Blu Liverpool with HVAC maintenance by Kimpton Wirral
  • Leisure/Hospitality
  • Service/Maintenance

Radisson Blu Liverpool PPM Contract

Client: Radisson Blu Liverpool Project: PPM Contract Project Scope: Mechanical Services Project Manager: Andy Morgan Overview Kimpton are working in partnership

Solar PV for Kimpton Energy Solutions
  • Commercial

Solar PV for Kimpton M&E

Project Details The Client: Kimpton Limited Customer: Kimpton Energy Solutions Service: Solar PV Project Value: £15,000 Project Completion: July 2012 The

  • Commercial
  • Commercial Fit-Out

Sovereign Gate House Grade A Office Refurbishment

Client: Watkin Jones Project Value: £800k Project Manager: Andy Morgan Overview Sovereign Gate is a prominent 5 storey office building in the heart of Richmond town

disabled-access to ACC Arena
  • Leisure/Hospitality
  • Commercial Fit-Out

Temporary Bar and Merch Store

Client: ACC Arena Location: Liverpool Project: Temporary Bar Project Managers: Phil Bowers and Scott Bennett Background The M&S Bank Arena, part of the ACC

Tower Hotel London Riser replacements by Kimpton Liverpool
  • Leisure/Hospitality

Tower Hotel London Riser replacement

Client: Greater London Hospitality Location: Tower Hotel Project: Hotel Risers replacement Project Manager: Paul Cooper Project Value: £450k Overview The project

Tower Hotel Boiler room replacement London by Kimpton
  • Leisure/Hospitality

Tower Hotel, London – Boiler House Refurbishment

Client: Greater London Hospitality (GLH) Project: Tower Hotel Project Value: £1.1m Project Scope: Boiler house Refurbishment Project Manager: Paul

Tata Steel Transpired Solar Collector
  • Industry/Technology

Transpired Solar Collector TATA Steel

The Client The SBEC (Sustainable Building Envelope Centre) in Deeside is a pioneering partnership between the Low Carbon Research Institute, TATA Steel and the Welsh

  • Acoustic

Workplace Noise Reduction for Carlsberg

The Client Carlsberg has grown to be one of the largest beer brewers in the UK having began brewing in Denmark in 1847. The company now supplies 140 countries worldwide

Creating the
sustainable building
environments of tomorrow

Quick enquiry

If you would like to discuss any of our services, please call 0151 343 1963 or complete the form below and we will be in touch shortly.

    Creating the
    sustainable building
    environments of tomorrow